Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Michigan State University |
---|---|
Assessment Year | 2023 |
Principal Product | they are a water treatment plant |
NAICS | 221310 - Water Supply and Irrigation Systems |
SIC | 4491 - Marine Cargo Handling |
Sales | $1,000,000-$5,000,000 |
# of Employees | 11 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 1,095,000 Thousand Gallons |
Production Hrs. Annual | 3,276 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $102,036 | 1,148,189 | kWh | $0.09 |
Electricity Fees | $47,493 | - | $ | - |
Natural Gas | $21,671 | 2,602 | MMBtu | $8.33 |
TOTAL ENERGY COSTS | $171,201 | |||
RECOMMENDED SAVINGS* | $100,835 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $85,388 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Primary Product | Electricity Usage | Natural Gas | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3321 USE STEAM PRESSURE REDUCTION TO GENERATE POWER |
Savings: $7,630 Cost: $31,680 |
$7,630 | 85,736 | - | - | - | - |
$7,630 85,736 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $30 Cost: $26 |
$30 | 338 | - | - | - | - |
$30 338 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,150 Cost: $11,550 |
$3,150 | 35,338 | - | - | - | - |
$3,150 35,338 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $64 Cost: - |
$64 | 722 | - | - | - | - |
$64 722 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $58 Cost: $262 |
$58 | 655 | - | - | - | - |
$58 655 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $4,579 Cost: $9,361 |
- | - | $4,579 | 550 | - | - |
- - kWh |
$4,579 550 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
Savings: $85,324 Cost: - |
- | - | - | - | $85,324 | - |
- - kWh |
- - MMBtu |
$85,324 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $100,835 Cost: $52,879 |
$10,932 | 122,789 | $4,579 | 550 | $85,324 | - | $10,932 122,789 kWh |
$4,579 550 MMBtu |
$85,324 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $85,388 Cost: - |
$64 | 722 | - | - | $85,324 | - | $64 722 kWh |
- - MMBtu |
$85,324 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Primary Product | Electricity Usage | Natural Gas | Primary Product |