IAC logo
IAC Assessment: MUWT04
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MUWT04
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Michigan State University
Assessment Year 2023
Principal Product they are a water treatment plant
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4491 - Marine Cargo Handling
Sales $1,000,000-$5,000,000
# of Employees 11
Plant Area (Sq.Ft.) 50,000
Annual Production 1,095,000 Thousand Gallons
Production Hrs. Annual 3,276
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,036 1,148,189 kWh $0.09
Electricity Fees $47,493 - $ -
Natural Gas $21,671 2,602 MMBtu $8.33
TOTAL ENERGY COSTS $171,201
RECOMMENDED SAVINGS* $100,835 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $85,388
#|Description Savings
Cost
Status Electricity Usage Natural Gas Primary Product Electricity Usage Natural Gas Primary Product
$ kWh $ MMBtu $ $
01: 2.3321 USE STEAM PRESSURE REDUCTION TO GENERATE POWER Savings:
$7,630
Cost:
$31,680
$7,630 85,736 - - - - $7,630
85,736
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$30
Cost:
$26
$30 338 - - - - $30
338
kWh
-
-
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,150
Cost:
$11,550
$3,150 35,338 - - - - $3,150
35,338
kWh
-
-
MMBtu
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$64
Cost:
-
$64 722 - - - - $64
722
kWh
-
-
MMBtu
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$58
Cost:
$262
$58 655 - - - - $58
655
kWh
-
-
MMBtu
-
-
$
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$4,579
Cost:
$9,361
- - $4,579 550 - - -
-
kWh
$4,579
550
MMBtu
-
-
$
07: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$85,324
Cost:
-
- - - - $85,324 - -
-
kWh
-
-
MMBtu
$85,324
-
$
TOTAL RECOMMENDED Savings:
$100,835
Cost:
$52,879
$10,932 122,789 $4,579 550 $85,324 - $10,932
122,789
kWh
$4,579
550
MMBtu
$85,324
-
$
TOTAL IMPLEMENTED Savings:
$85,388
Cost:
-
$64 722 - - $85,324 - $64
722
kWh
-
-
MMBtu
$85,324
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Primary Product Electricity Usage Natural Gas Primary Product