IAC logo
IAC Assessment: MZ0003
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0003
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2007
Principal Product shampoos, lotions, body wash
NAICS 325611 - Soap and Other Detergent Manufacturing
SIC 2841 - Soap And Other Detergents
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 550,000
Annual Production 1 Units
Production Hrs. Annual 8,736
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,500,000 36,915,121 kWh $0.04
Natural Gas $800,000 73,361 MMBtu $10.90
TOTAL ENERGY COSTS $2,308,000
RECOMMENDED SAVINGS* $372,788 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1224 REPLACE BOILER Savings:
$237,208
Cost:
$220,000
- - $237,208 23,720 -
-
kWh
$237,208
23,720
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$56,702
Cost:
$7,764
$56,702 1,012,528 - - $56,702
1,012,528
kWh
-
-
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$23,859
Cost:
$30,000
- - $23,859 2,386 -
-
kWh
$23,859
2,386
MMBtu
04: 2.7122 DISCONNECT BALLASTS Savings:
$45,032
Cost:
$4,012
$45,032 759,492 - - $45,032
759,492
kWh
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,992
Cost:
$2,950
$5,992 131,400 - - $5,992
131,400
kWh
-
-
MMBtu
06: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$3,995
Cost:
$500
$3,995 87,600 - - $3,995
87,600
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$372,788
Cost:
$265,226
$111,721 1,991,020 $261,067 26,106 $111,721
1,991,020
kWh
$261,067
26,106
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas