Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2012 |
Principal Product | castings |
NAICS | 331524 - Aluminum Foundries (except Die-Casting) |
SIC | 3365 - Aluminum Foundries |
Sales | $10,000,000-$50,000,000 |
# of Employees | 180 |
Plant Area (Sq.Ft.) | 85,000 |
Annual Production | 65,000 Pieces |
Production Hrs. Annual | 8,500 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $332,034 | 5,004,600 | kWh | $0.07 |
Natural Gas | $130,346 | 16,626 | MMBtu | $7.84 |
TOTAL ENERGY COSTS | $462,380 | |||
RECOMMENDED SAVINGS* | $102,203 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $102,203 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $16,034 Cost: $860 |
$15,233 | 230,809 | $801 | 327 | - | - |
$15,233 230,809 kWh |
$801 327 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $4,444 Cost: $4,000 |
- | - | - | - | $4,444 | 549 |
- - kWh |
- - kW-months/year |
$4,444 549 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $9,628 Cost: $8,667 |
- | - | - | - | $9,628 | 1,190 |
- - kWh |
- - kW-months/year |
$9,628 1,190 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $11,110 Cost: $9,100 |
- | - | - | - | $11,110 | 1,373 |
- - kWh |
- - kW-months/year |
$11,110 1,373 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR |
Savings: $58,850 Cost: $120,000 |
$55,910 | 847,128 | $2,940 | 1,200 | - | - |
$55,910 847,128 kWh |
$2,940 1,200 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $2,137 Cost: $1,700 |
- | - | - | - | $2,137 | 264 |
- - kWh |
- - kW-months/year |
$2,137 264 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $0 Cost: - |
$0 | 1 | - | - | - | - |
$0 1 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $102,203 Cost: $144,327 |
$71,143 | 1,077,938 | $3,741 | 1,527 | $27,319 | 3,376 | $71,143 1,077,938 kWh |
$3,741 1,527 kW-months/year |
$27,319 3,376 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $102,203 Cost: $144,327 |
$71,143 | 1,077,938 | $3,741 | 1,527 | $27,319 | 3,376 | $71,143 1,077,938 kWh |
$3,741 1,527 kW-months/year |
$27,319 3,376 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |