IAC logo
IAC Assessment: MZ0101
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0101
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2012
Principal Product Rubber & Plastics Hose & Belting
NAICS 326220 - Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052 - Rubber & Plastics Hose & Belting
Sales $50,000,000-$100,000,000
# of Employees 195
Plant Area (Sq.Ft.) 293,000
Annual Production 1 Units
Production Hrs. Annual 8,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $201,251 2,886,000 kWh $0.07
Electricity Demand $20,901 7,394 kW-months/year $2.83
Natural Gas $97,908 10,735 MMBtu $9.12
TOTAL ENERGY COSTS $320,060
RECOMMENDED SAVINGS* $8,867 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,933
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,105
Cost:
$1,160
$1,025 14,647 $80 28 - - $1,025
14,647
kWh
$80
28
kW-months/year
-
-
MMBtu
02: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM Savings:
$934
Cost:
$4,969
$737 10,533 $196 69 - - $737
10,533
kWh
$196
69
kW-months/year
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,340
Cost:
$8,800
- - - - $6,340 688 -
-
kWh
-
-
kW-months/year
$6,340
688
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$199
Cost:
$297
- - - - $199 21 -
-
kWh
-
-
kW-months/year
$199
21
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$290
Cost:
$360
- - - - $290 32 -
-
kWh
-
-
kW-months/year
$290
32
MMBtu
TOTAL RECOMMENDED Savings:
$8,867
Cost:
$15,586
$1,763 25,180 $276 98 $6,829 740 $1,763
25,180
kWh
$276
98
kW-months/year
$6,829
740
MMBtu
TOTAL IMPLEMENTED Savings:
$7,933
Cost:
$10,617
$1,025 14,647 $80 28 $6,829 740 $1,025
14,647
kWh
$80
28
kW-months/year
$6,829
740
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas