IAC Assessment: MZ0145
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0145
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2014
Principal Product glass containers
NAICS 327213 - Glass Container Manufacturing
SIC 3221 - Glass Containers
Sales $10,000,000-$50,000,000
# of Employees 315
Plant Area (Sq.Ft.) 354,300
Annual Production 389,500,000 Pieces
Production Hrs. Annual 8,600
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,858,294 46,051,191 kWh $0.04
Electricity Demand $773,608 63,142 kW-months/year $12.25
Natural Gas $2,485,080 545,602 MMBtu $4.55
TOTAL ENERGY COSTS $5,116,982
RECOMMENDED SAVINGS* $526,892 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $436,367
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$89,896
Cost:
$277,500
$62,995 1,574,875 $26,901 2,196 - - $62,995
1,574,875
kWh
$26,901
2,196
kW-months/year
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$105,420
Cost:
$300,000
- - - - $105,420 23,169 -
-
kWh
-
-
kW-months/year
$105,420
23,169
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$192,210
Cost:
$220,000
$192,210 4,805,250 - - - - $192,210
4,805,250
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$113,101
Cost:
$200,000
$113,101 2,827,525 - - - - $113,101
2,827,525
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$629
Cost:
$1,000
- - - - $629 138 -
-
kWh
-
-
kW-months/year
$629
138
MMBtu
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$17,814
Cost:
$30,000
$12,485 312,125 $5,329 435 - - $12,485
312,125
kWh
$5,329
435
kW-months/year
-
-
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,268
Cost:
-
$4,268 106,707 - - - - $4,268
106,707
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,868
Cost:
-
$1,058 26,445 $810 66 - - $1,058
26,445
kWh
$810
66
kW-months/year
-
-
MMBtu
09: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,686
Cost:
$2,450
$1,686 42,140 - - - - $1,686
42,140
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$526,892
Cost:
$1,030,950
$387,803 9,695,067 $33,040 2,697 $106,049 23,307 $387,803
9,695,067
kWh
$33,040
2,697
kW-months/year
$106,049
23,307
MMBtu
TOTAL IMPLEMENTED Savings:
$436,367
Cost:
$752,450
$324,808 8,120,192 $6,139 501 $105,420 23,169 $324,808
8,120,192
kWh
$6,139
501
kW-months/year
$105,420
23,169
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas