IAC logo
IAC Assessment: MZ0154
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0154
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2014
Principal Product Plumbing and roofing products
NAICS 332913 - Plumbing Fixture Fitting and Trim Manufacturing
SIC 3432 - Plumbing Fixture Fittings And Trim
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 100,000
Annual Production 55,351,120 Pieces
Production Hrs. Annual 4,250
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $267,511 2,932,800 kWh $0.09
Natural Gas $17,500 2,581 MMBtu $6.78
TOTAL ENERGY COSTS $285,011
RECOMMENDED SAVINGS* $26,927 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,442
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Electricity Usage Personnel Changes
$ kWh $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,053
Cost:
$1,680
$9,053 99,254 - - $9,053
99,254
kWh
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,547
Cost:
$10,920
$8,547 93,705 - - $8,547
93,705
kWh
-
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$4,064
Cost:
$6,700
$4,064 44,554 - - $4,064
44,554
kWh
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,059
Cost:
$1,260
$3,699 40,551 $(-640) - $3,699
40,551
kWh
$(-640)
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,821
Cost:
$1,740
$1,821 19,968 - - $1,821
19,968
kWh
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$383
Cost:
$850
$383 4,200 - - $383
4,200
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$26,927
Cost:
$23,150
$27,567 302,232 $(-640) - $27,567
302,232
kWh
$(-640)
-
$
TOTAL IMPLEMENTED Savings:
$3,442
Cost:
$2,110
$4,082 44,751 $(-640) - $4,082
44,751
kWh
$(-640)
-
$
Savings
Cost
$ kWh $ $