IAC logo
IAC Assessment: MZ0250
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0250
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2018
Principal Product glass foam insulation
NAICS 327212 - Other Pressed and Blown Glass and Glassware Manufacturing
SIC 3229 - Pressed And Blown Glass, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 1,733,864
Annual Production 40,000,000 Units
Production Hrs. Annual 8,520
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,374,123 25,940,000 kWh $0.05
Electricity Demand $233,280 40,080 kW-months/year $5.82
Natural Gas $2,519,518 566,020 MMBtu $4.45
TOTAL ENERGY COSTS $4,126,921
RECOMMENDED SAVINGS* $51,848 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,834
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,351
Cost:
$5,600
- - - - $2,351 528 -
-
kWh
-
-
kW-months/year
$2,351
528
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$27,014
Cost:
$65,000
- - - - $27,014 6,071 -
-
kWh
-
-
kW-months/year
$27,014
6,071
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,786
Cost:
$280
$1,537 29,008 $249 43 - - $1,537
29,008
kWh
$249
43
kW-months/year
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$20,697
Cost:
-
$17,941 338,502 $2,756 477 - - $17,941
338,502
kWh
$2,756
477
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$51,848
Cost:
$70,880
$19,478 367,510 $3,005 520 $29,365 6,599 $19,478
367,510
kWh
$3,005
520
kW-months/year
$29,365
6,599
MMBtu
TOTAL IMPLEMENTED Savings:
$24,834
Cost:
$5,880
$19,478 367,510 $3,005 520 $2,351 528 $19,478
367,510
kWh
$3,005
520
kW-months/year
$2,351
528
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas