Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2020 |
Principal Product | small metal couplings |
NAICS | 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3429 - Hardware, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 336 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 63,000,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $688,819 | 9,560,784 | kWh | $0.07 |
Natural Gas | $79,533 | 38,512 | MMBtu | $2.07 |
TOTAL ENERGY COSTS | $768,352 | |||
RECOMMENDED SAVINGS* | $168,441 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Primary Raw Material | Electricity Usage | Natural Gas | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $924 Cost: $1,200 |
$924 | 12,960 | - | - | - | - |
$924 12,960 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $669 Cost: $200 |
$669 | 9,374 | - | - | - | - |
$669 9,374 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,596 Cost: $6,400 |
$2,596 | 37,235 | - | - | - | - |
$2,596 37,235 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT |
Savings: $1,669 Cost: $288 |
$1,669 | 21,402 | - | - | - | - |
$1,669 21,402 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $3,506 Cost: $8,000 |
- | - | $3,506 | 1,694 | - | - |
- - kWh |
$3,506 1,694 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST |
Savings: $100,865 Cost: $197,145 |
$(-2,506) | (-35,100) | - | - | $103,371 | - |
$(-2,506) (-35,100) kWh |
- - MMBtu |
$103,371 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST |
Savings: $57,876 Cost: $199,418 |
$(-2,034) | (-29,700) | - | - | $59,910 | - |
$(-2,034) (-29,700) kWh |
- - MMBtu |
$59,910 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $336 Cost: $360 |
$336 | 4,717 | - | - | - | - |
$336 4,717 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $168,441 Cost: $413,011 |
$1,654 | 20,888 | $3,506 | 1,694 | $163,281 | - | $1,654 20,888 kWh |
$3,506 1,694 MMBtu |
$163,281 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Primary Raw Material | Electricity Usage | Natural Gas | Primary Raw Material |