Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2021
Principal Product HDPE extruded parts
NAICS 332313 - Plate Work Manufacturing
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $50,000,000-$100,000,000
# of Employees 76
Plant Area (Sq.Ft.) 88,400
Annual Production 70,000,000 Pounds
Production Hrs. Annual 4,368
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,224,929 20,909,480 kWh $0.06
Electricity Demand $221,679 37,348 kW-months/year $5.94
Natural Gas $2,629 194 MMBtu $13.55
TOTAL ENERGY COSTS $1,462,414
RECOMMENDED SAVINGS* $28,043 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,808
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$10,092
Cost:
$12,000
$10,092 171,053 - - $10,092
171,053
kWh
-
-
kW-months/year
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,821
Cost:
$240
$2,198 37,247 $623 105 $2,198
37,247
kWh
$623
105
kW-months/year
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,470
Cost:
$9,762
$1,152 19,533 $318 54 $1,152
19,533
kWh
$318
54
kW-months/year
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$12,708
Cost:
$15,605
$9,952 168,684 $2,756 464 $9,952
168,684
kWh
$2,756
464
kW-months/year
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$375
Cost:
$389
$294 4,976 $81 14 $294
4,976
kWh
$81
14
kW-months/year
06: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$298
Cost:
$1,226
$298 5,122 - - $298
5,122
kWh
-
-
kW-months/year
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$279
Cost:
$360
$279 4,723 - - $279
4,723
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$28,043
Cost:
$39,582
$24,265 411,338 $3,778 637 $24,265
411,338
kWh
$3,778
637
kW-months/year
TOTAL IMPLEMENTED Savings:
$15,808
Cost:
$16,205
$12,429 210,654 $3,379 569 $12,429
210,654
kWh
$3,379
569
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand