Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2021 |
Principal Product | air compressors and blowers |
NAICS | 333912 - Air and Gas Compressor Manufacturing |
SIC | 3563 - Air And Gas Compressors |
Sales | $10,000,000-$50,000,000 |
# of Employees | 205 |
Plant Area (Sq.Ft.) | 330,000 |
Annual Production | 270,861 Pieces |
Production Hrs. Annual | 5,928 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $597,883 | 8,723,916 | kWh | $0.07 |
Electricity Demand | $71,725 | 35,358 | kW-months/year | $2.03 |
Natural Gas | $35,155 | 9,657 | MMBtu | $3.64 |
TOTAL ENERGY COSTS | $752,319 | |||
RECOMMENDED SAVINGS* | $140,320 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $106,671 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Electricity Usage | Electricity Demand | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $14,197 Cost: $657 |
$14,197 | 205,754 | - | - | - | - |
$14,197 205,754 kWh |
- - kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $21,760 Cost: $11,000 |
$21,760 | 315,360 | - | - | - | - |
$21,760 315,360 kWh |
- - kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $46,936 Cost: $63,900 |
$42,853 | 621,051 | $4,083 | 2,012 | - | - |
$42,853 621,051 kWh |
$4,083 2,012 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $23,778 Cost: $5,120 |
- | - | - | - | $23,778 | 3,520 |
- - kWh |
- - kW-months/year |
$23,778 3,520 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $33,649 Cost: $58,976 |
$27,175 | 393,847 | $6,474 | 3,189 | - | - |
$27,175 393,847 kWh |
$6,474 3,189 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $140,320 Cost: $139,653 |
$105,985 | 1,536,012 | $10,557 | 5,201 | $23,778 | 3,520 | $105,985 1,536,012 kWh |
$10,557 5,201 kW-months/year |
$23,778 3,520 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $106,671 Cost: $80,677 |
$78,810 | 1,142,165 | $4,083 | 2,012 | $23,778 | 3,520 | $78,810 1,142,165 kWh |
$4,083 2,012 kW-months/year |
$23,778 3,520 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Electricity Usage | Electricity Demand | Water Disposal |