IAC Assessment: MZ0322
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0322
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2021
Principal Product domestic and industrial wastewater
NAICS 562219 - Other Nonhazardous Waste Treatment and Disposal
SIC 4953 - Refuse Systems
Sales <$500,000
# of Employees 4
Plant Area (Sq.Ft.) 850,000
Annual Production 1,500,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $191,947 3,679,190 kWh $0.05
Electricity Demand $35,077 6,472 kW-months/year $5.42
TOTAL ENERGY COSTS $227,024
RECOMMENDED SAVINGS* $85,339 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand By-product Production Electricity Usage Electricity Demand By-product Production
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$23,809
Cost:
$9,182
$23,809 457,393 - - - - $23,809
457,393
kWh
-
-
kW-months/year
-
-
$
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$61,530
Cost:
$226,000
$(-4,338) (-83,432) $(-732) (-135) $66,600 - $(-4,338)
(-83,432)
kWh
$(-732)
(-135)
kW-months/year
$66,600
-
$
TOTAL RECOMMENDED Savings:
$85,339
Cost:
$235,182
$19,471 373,961 $(-732) (-135) $66,600 - $19,471
373,961
kWh
$(-732)
(-135)
kW-months/year
$66,600
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand By-product Production Electricity Usage Electricity Demand By-product Production