IAC logo
IAC Assessment: MZ0324
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0324
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2021
Principal Product Auto door panels, Consoles
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 489
Plant Area (Sq.Ft.) 332,000
Annual Production 10,000,000 Pieces
Production Hrs. Annual 5,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $507,438 6,458,949 kWh $0.08
Electricity Demand $167,516 39,276 kW-months/year $4.27
Natural Gas $141,792 7,465 MMBtu $18.99
TOTAL ENERGY COSTS $816,746
RECOMMENDED SAVINGS* $95,049 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,857
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,260
Cost:
$480
$1,155 14,623 $105 25 - - $1,155
14,623
kWh
$105
25
kW-months/year
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,050
Cost:
$7,800
$4,539 57,451 $511 120 - - $4,539
57,451
kWh
$511
120
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$269
Cost:
$340
$269 3,406 - - - - $269
3,406
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$12,278
Cost:
$240
- - - - $12,278 647 -
-
kWh
-
-
kW-months/year
$12,278
647
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,182
Cost:
$17,137
$10,411 131,783 $771 181 - - $10,411
131,783
kWh
$771
181
kW-months/year
-
-
MMBtu
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$65,010
Cost:
$664,200
$60,506 765,904 $4,504 1,050 - - $60,506
765,904
kWh
$4,504
1,050
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$95,049
Cost:
$690,197
$76,880 973,167 $5,891 1,376 $12,278 647 $76,880
973,167
kWh
$5,891
1,376
kW-months/year
$12,278
647
MMBtu
TOTAL IMPLEMENTED Savings:
$18,857
Cost:
$8,860
$5,963 75,480 $616 145 $12,278 647 $5,963
75,480
kWh
$616
145
kW-months/year
$12,278
647
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas