IAC Assessment: MZ0325
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0325
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2022
Principal Product domestic and industrial wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 12
Plant Area (Sq.Ft.) 100,176
Annual Production 5,292,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $398,122 7,596,000 kWh $0.05
Electricity Demand $39,952 14,612 kW-months/year $2.73
Natural Gas $73,412 12,177 MMBtu $6.03
TOTAL ENERGY COSTS $511,486
RECOMMENDED SAVINGS* $444,467 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $163,563
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Usage One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ Tgal $ $
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$113,192
Cost:
-
$113,192 2,177,000 - - - - - - $113,192
2,177,000
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$56,407
Cost:
$636,000
$56,407 1,084,750 - - - - - - $56,407
1,084,750
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$224,497
Cost:
$226,000
$(-4,338) (-83,432) $(-368) (-135) - - $229,203 - $(-4,338)
(-83,432)
kWh
$(-368)
(-135)
kW-months/year
-
-
Tgal
$229,203
-
$
04: 3.4151 MINIMIZE WATER USAGE Savings:
$50,371
Cost:
$4,080
$(-142) (-2,728) $(-25) (-9) $50,538 8,395 - - $(-142)
(-2,728)
kWh
$(-25)
(-9)
kW-months/year
$50,538
8,395
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$444,467
Cost:
$866,080
$165,119 3,175,590 $(-393) (-144) $50,538 8,395 $229,203 - $165,119
3,175,590
kWh
$(-393)
(-144)
kW-months/year
$50,538
8,395
Tgal
$229,203
-
$
TOTAL IMPLEMENTED Savings:
$163,563
Cost:
$4,080
$113,050 2,174,272 $(-25) (-9) $50,538 8,395 - - $113,050
2,174,272
kWh
$(-25)
(-9)
kW-months/year
$50,538
8,395
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Usage One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Usage One-time Revenue or Avoided Cost