IAC Assessment: MZ0340
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0340
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2023
Principal Product Rubber and plastic components for construction machinery
NAICS 333120 - Construction Machinery Manufacturing
SIC 3531 - Construction Machinery
Sales $50,000,000-$100,000,000
# of Employees 210
Plant Area (Sq.Ft.) 75,000
Annual Production 22,000,000 Pieces
Production Hrs. Annual 8,496
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,546,621 15,262,991 kWh $0.10
Electricity Demand $146,593 41,818 kW-months/year $3.51
Natural Gas $445,020 109,104 MMBtu $4.08
TOTAL ENERGY COSTS $2,276,793
RECOMMENDED SAVINGS* $263,261 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,366
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,529
Cost:
$720
- - - - $3,529 865 - - -
-
kWh
-
-
kW-months/year
$3,529
865
MMBtu
-
-
Tgal
02: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$3,688
Cost:
$320
$3,516 34,809 $172 49 - - - - $3,516
34,809
kWh
$172
49
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$27,810
Cost:
$3,202
$26,508 262,455 $1,302 371 - - - - $26,508
262,455
kWh
$1,302
371
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$618
Cost:
$260
$618 6,119 - - - - - - $618
6,119
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$6,940
Cost:
$4,520
- - - - - - $6,940 479 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,940
479
Tgal
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,084
Cost:
$18,000
- - - - $5,084 1,246 - - -
-
kWh
-
-
kW-months/year
$5,084
1,246
MMBtu
-
-
Tgal
07: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$188,061
Cost:
$900,000
$161,079 1,594,845 $26,982 7,687 - - - - $161,079
1,594,845
kWh
$26,982
7,687
kW-months/year
-
-
MMBtu
-
-
Tgal
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$27,531
Cost:
$5,336
$27,531 272,580 - - - - - - $27,531
272,580
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$263,261
Cost:
$932,358
$219,252 2,170,808 $28,456 8,107 $8,613 2,111 $6,940 479 $219,252
2,170,808
kWh
$28,456
8,107
kW-months/year
$8,613
2,111
MMBtu
$6,940
479
Tgal
TOTAL IMPLEMENTED Savings:
$35,366
Cost:
$6,636
$31,665 313,508 $172 49 $3,529 865 - - $31,665
313,508
kWh
$172
49
kW-months/year
$3,529
865
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal