IAC Assessment: MZ0343
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0343
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2023
Principal Product Rubber belts
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 360
Plant Area (Sq.Ft.) 649,000
Annual Production 3,146,339 Pieces
Production Hrs. Annual 7,488
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,126,583 18,363,513 kWh $0.06
Electricity Demand $494,632 37,450 kW-months/year $13.21
Natural Gas $1,730,653 247,175 MMBtu $7.00
TOTAL ENERGY COSTS $3,351,868
RECOMMENDED SAVINGS* $397,171 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$4,951
Cost:
$31,059
$3,675 60,249 $1,276 97 - - - - $3,675
60,249
kWh
$1,276
97
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,711
Cost:
$360
$1,711 28,035 - - - - - - $1,711
28,035
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,510
Cost:
$9,100
$4,090 67,047 $1,420 107 - - - - $4,090
67,047
kWh
$1,420
107
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$8,146
Cost:
$1,330
- - - - $8,146 952 - - -
-
kWh
-
-
kW-months/year
$8,146
952
MMBtu
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$12,303
Cost:
$5,150
$11,944 195,783 $359 27 - - - - $11,944
195,783
kWh
$359
27
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,575
Cost:
$28,807
$9,575 156,987 - - - - - - $9,575
156,987
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$52,726
Cost:
$2,400
- - - - $52,726 7,532 - - -
-
kWh
-
-
kW-months/year
$52,726
7,532
MMBtu
-
-
$
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$126,570
Cost:
$196,842
- - $100,305 7,648 - - $26,265 - -
-
kWh
$100,305
7,648
kW-months/year
-
-
MMBtu
$26,265
-
$
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$175,679
Cost:
$545,812
$77,669 1,273,259 $98,010 7,476 - - - - $77,669
1,273,259
kWh
$98,010
7,476
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$397,171
Cost:
$820,860
$108,664 1,781,360 $201,370 15,355 $60,872 8,484 $26,265 - $108,664
1,781,360
kWh
$201,370
15,355
kW-months/year
$60,872
8,484
MMBtu
$26,265
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost