IAC logo
IAC Assessment: MZ0356
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0356
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2023
Principal Product underbody welded assemblies
NAICS 336211 - Motor Vehicle Body Manufacturing
SIC 3711 - Motor Vehicles And Car Bodies
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 470,000
Annual Production 298,898 Pieces
Production Hrs. Annual 4,704
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,136,953 15,550,660 kWh $0.07
Electricity Demand $108,754 33,440 kW-months/year $3.25
Natural Gas $194,004 15,923 MMBtu $12.18
TOTAL ENERGY COSTS $1,456,438
RECOMMENDED SAVINGS* $735,794 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,756
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Usage Water Disposal One-time Revenue or Avoided Cost Electricity Usage Natural Gas Water Usage Water Disposal One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ Tgal $ Tgal $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$519
Cost:
$415
$519 7,113 - - - - - - - - $519
7,113
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$10,731
Cost:
$440
$10,731 146,994 - - - - - - - - $10,731
146,994
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$29,176
Cost:
$63,400
- - $29,176 2,395 - - - - - - -
-
kWh
$29,176
2,395
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,117
Cost:
$14,802
$11,117 152,262 - - - - - - - - $11,117
152,262
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$6,120
Cost:
$2,680
$3,967 54,356 $2,153 177 - - - - - - $3,967
54,356
kWh
$2,153
177
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$525,252
Cost:
$3,450,533
$525,252 7,236,330 - - - - - - - - $525,252
7,236,330
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
07: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$135,000
Cost:
$306,035
- - - - - - - - $135,000 - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$135,000
-
$
08: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$7,202
Cost:
$7,540
- - - - - - $7,202 663 - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$7,202
663
Tgal
-
-
$
09: 3.4159 REPLACE TREATED WATER WITH WELL / SURFACE WATER Savings:
$10,677
Cost:
$100,000
- - - - $3,448 663 $7,229 663 - - -
-
kWh
-
-
MMBtu
$3,448
663
Tgal
$7,229
663
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$735,794
Cost:
$3,945,845
$551,586 7,597,055 $31,329 2,572 $3,448 663 $14,431 1,326 $135,000 - $551,586
7,597,055
kWh
$31,329
2,572
MMBtu
$3,448
663
Tgal
$14,431
1,326
Tgal
$135,000
-
$
TOTAL IMPLEMENTED Savings:
$17,756
Cost:
$17,897
$15,603 213,731 $2,153 177 - - - - - - $15,603
213,731
kWh
$2,153
177
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ Tgal $ $
Electricity Usage Natural Gas Water Usage Water Disposal One-time Revenue or Avoided Cost Electricity Usage Natural Gas Water Usage Water Disposal One-time Revenue or Avoided Cost