IAC logo
IAC Assessment: MZ0360
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0360
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2024
Principal Product chimney caps
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 122,300
Annual Production 478,000 Pieces
Production Hrs. Annual 2,125
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,439 535,689 kWh $0.09
Electricity Demand $16,698 3,976 kW-months/year $4.20
Natural Gas $138,730 14,516 MMBtu $9.56
TOTAL ENERGY COSTS $204,867
RECOMMENDED SAVINGS* $21,856 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,834
Cost:
$5,300
$448 4,896 $1,386 330 - - $448
4,896
kWh
$1,386
330
kW-months/year
-
-
MMBtu
02: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$8,851
Cost:
$11,852
$8,851 96,209 - - - - $8,851
96,209
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,978
Cost:
$18,853
$7,978 86,713 - - - - $7,978
86,713
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,193
Cost:
$8,300
- - - - $3,193 334 -
-
kWh
-
-
kW-months/year
$3,193
334
MMBtu
TOTAL RECOMMENDED Savings:
$21,856
Cost:
$44,305
$17,277 187,818 $1,386 330 $3,193 334 $17,277
187,818
kWh
$1,386
330
kW-months/year
$3,193
334
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas