IAC Assessment: MZ0369
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0369
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2025
Principal Product stamped parts for motor vehicles
NAICS 336111 - Automobile Manufacturing
SIC 3711 - Motor Vehicles And Car Bodies
Sales $50,000,000-$100,000,000
# of Employees 162
Plant Area (Sq.Ft.) 196,000
Annual Production 14,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,660 5,201,408 kWh $0.04
Electricity Demand $283,460 11,140 kW-months/year $25.45
Natural Gas $80,614 10,307 MMBtu $7.82
TOTAL ENERGY COSTS $557,734
RECOMMENDED SAVINGS* $104,688 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,842
Cost:
$16,170
$3,842 103,865 - - - - - - $3,842
103,865
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$3,668
Cost:
$35,570
$1,135 30,680 $2,533 100 - - - - $1,135
30,680
kWh
$2,533
100
kW-months/year
-
-
MMBtu
-
-
$
03: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$62,544
Cost:
$926,250
$48,369 1,307,289 $14,175 557 - - - - $48,369
1,307,289
kWh
$14,175
557
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$23,108
Cost:
$9,760
- - - - $23,108 2,955 - - -
-
kWh
-
-
kW-months/year
$23,108
2,955
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,599
Cost:
$7,900
$1,515 40,945 $2,084 82 - - - - $1,515
40,945
kWh
$2,084
82
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,987
Cost:
$1,000
$2,721 62,142 $3,266 124 - - - - $2,721
62,142
kWh
$3,266
124
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,940
Cost:
$870
$554 14,976 $762 30 - - $624 - $554
14,976
kWh
$762
30
kW-months/year
-
-
MMBtu
$624
-
$
TOTAL RECOMMENDED Savings:
$104,688
Cost:
$997,520
$58,136 1,559,897 $22,820 893 $23,108 2,955 $624 - $58,136
1,559,897
kWh
$22,820
893
kW-months/year
$23,108
2,955
MMBtu
$624
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost