IAC logo
IAC Assessment: MZ0371
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0371
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2025
Principal Product solvent borne acrylic and polyester resins
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $50,000,000-$100,000,000
# of Employees 75
Plant Area (Sq.Ft.) 16,000
Annual Production 23,000 Tons
Production Hrs. Annual 7,200
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $401,949 2,507,468 kWh $0.16
Natural Gas $206,670 64,118 MMBtu $3.22
TOTAL ENERGY COSTS $608,619
RECOMMENDED SAVINGS* $392,229 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas One-time Revenue or Avoided Cost Electricity Usage Natural Gas One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,847
Cost:
$3,600
$5,847 36,318 - - - - $5,847
36,318
kWh
-
-
MMBtu
-
-
$
02: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$1,063
Cost:
$3,900
- - $1,063 330 - - -
-
kWh
$1,063
330
MMBtu
-
-
$
03: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$1,555
Cost:
$5,880
- - $1,555 483 - - -
-
kWh
$1,555
483
MMBtu
-
-
$
04: 2.1224 REPLACE BOILER Savings:
$383,764
Cost:
$475,000
- - $8,764 2,722 $375,000 - -
-
kWh
$8,764
2,722
MMBtu
$375,000
-
$
TOTAL RECOMMENDED Savings:
$392,229
Cost:
$488,380
$5,847 36,318 $11,382 3,535 $375,000 - $5,847
36,318
kWh
$11,382
3,535
MMBtu
$375,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas One-time Revenue or Avoided Cost Electricity Usage Natural Gas One-time Revenue or Avoided Cost