IAC logo
IAC Assessment: MZ0375
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0375
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2025
Principal Product fabricated structural steel
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $50,000,000-$100,000,000
# of Employees 170
Plant Area (Sq.Ft.) 328,000
Annual Production 12,000 Tons
Production Hrs. Annual 4,500
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $276,008 2,524,398 kWh $0.11
Electricity Demand $39,435 12,814 kW-months/year $3.08
Natural Gas $21,834 3,934 MMBtu $5.55
TOTAL ENERGY COSTS $337,277
RECOMMENDED SAVINGS* $476,962 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$19,447
Cost:
$22,100
- - - - $19,447 3,504 - - -
-
kWh
-
-
kW-months/year
$19,447
3,504
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,208
Cost:
$400
$2,053 18,832 $155 50 - - - - $2,053
18,832
kWh
$155
50
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,090
Cost:
$1,405
$1,090 10,000 - - - - - - $1,090
10,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,542
Cost:
$13,100
$12,542 115,066 - - - - - - $12,542
115,066
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$295
Cost:
$2,100
$295 2,705 - - - - - - $295
2,705
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$4,865
Cost:
-
$3,084 28,296 - - $1,781 321 - - $3,084
28,296
kWh
-
-
kW-months/year
$1,781
321
MMBtu
-
-
$
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$34,746
Cost:
$214,502
$33,527 307,589 $1,219 396 - - - - $33,527
307,589
kWh
$1,219
396
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$7,435
Cost:
$12,750
$6,357 58,320 $1,078 350 - - - - $6,357
58,320
kWh
$1,078
350
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$394,334
Cost:
$2,410,000
$6,334 58,114 - - - - $388,000 - $6,334
58,114
kWh
-
-
kW-months/year
-
-
MMBtu
$388,000
-
$
TOTAL RECOMMENDED Savings:
$476,962
Cost:
$2,676,357
$65,282 598,922 $2,452 796 $21,228 3,825 $388,000 - $65,282
598,922
kWh
$2,452
796
kW-months/year
$21,228
3,825
MMBtu
$388,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost