IAC logo
IAC Assessment: MZ0377
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0377
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2025
Principal Product valves - TEV, EEV, 3-way valves
NAICS 332912 - Fluid Power Valve and Hose Fitting Manufacturing
SIC 3492 - Fluid Power Valves & Hose Fittings
Sales $100,000,000-$500,000,000
# of Employees 415
Plant Area (Sq.Ft.) 150,000
Annual Production 4,000,000 Pieces
Production Hrs. Annual 7,224
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $827,518 10,806,073 kWh $0.08
Electricity Demand $75,266 22,140 kW-months/year $3.40
Natural Gas $69,556 5,544 MMBtu $12.55
TOTAL ENERGY COSTS $1,052,237
RECOMMENDED SAVINGS* $73,749 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,928
Cost:
$9,400
$7,928 102,958 - - - - $7,928
102,958
kWh
-
-
kW-months/year
-
-
Tgal
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$498
Cost:
$415
$498 6,463 - - - - $498
6,463
kWh
-
-
kW-months/year
-
-
Tgal
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$871
Cost:
-
$811 10,539 $60 18 - - $811
10,539
kWh
$60
18
kW-months/year
-
-
Tgal
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,340
Cost:
$2,300
$2,300 29,880 $2,040 600 - - $2,300
29,880
kWh
$2,040
600
kW-months/year
-
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$769
Cost:
$200
$716 9,305 $53 15 - - $716
9,305
kWh
$53
15
kW-months/year
-
-
Tgal
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$26,142
Cost:
$43,500
$24,356 316,316 $1,786 525 - - $24,356
316,316
kWh
$1,786
525
kW-months/year
-
-
Tgal
07: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$31,698
Cost:
$9,040
- - - - $31,698 4,725 -
-
kWh
-
-
kW-months/year
$31,698
4,725
Tgal
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,503
Cost:
$3,660
$1,401 18,201 $102 30 - - $1,401
18,201
kWh
$102
30
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$73,749
Cost:
$68,515
$38,010 493,662 $4,041 1,188 $31,698 4,725 $38,010
493,662
kWh
$4,041
1,188
kW-months/year
$31,698
4,725
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal