Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2025
Principal Product cutting tools
NAICS 333517 - Machine Tool Manufacturing
SIC 3545 - Machine Tool Accessories
Sales $10,000,000-$50,000,000
# of Employees 450
Plant Area (Sq.Ft.) 255,000
Annual Production 10,950,000 Pieces
Production Hrs. Annual 4,420
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $685,513 7,908,953 kWh $0.09
Electricity Demand $163,955 20,308 kW-months/year $8.07
Natural Gas $46,294 4,520 MMBtu $10.24
TOTAL ENERGY COSTS $895,762
RECOMMENDED SAVINGS* $242,618 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,972
Cost:
$3,500
$1,972 22,742 - - - - $1,972
22,742
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$26,585
Cost:
$49,000
$26,585 306,638 - - - - $26,585
306,638
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,373
Cost:
$750
$4,373 50,442 - - - - $4,373
50,442
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,470
Cost:
$750
$2,197 25,150 $273 34 - - $2,197
25,150
kWh
$273
34
kW-months/year
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$10,844
Cost:
$12,060
- - - - $10,844 1,059 -
-
kWh
-
-
kW-months/year
$10,844
1,059
MMBtu
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$196,374
Cost:
$1,560,000
$188,180 2,170,469 $8,194 1,015 - - $188,180
2,170,469
kWh
$8,194
1,015
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$242,618
Cost:
$1,626,060
$223,307 2,575,441 $8,467 1,049 $10,844 1,059 $223,307
2,575,441
kWh
$8,467
1,049
kW-months/year
$10,844
1,059
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas