IAC Assessment: MZ1014
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ1014
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2025
Principal Product community center
NAICS 624110 - Child and Youth Services
SIC 8322 - Individual And Family Services
Sales <$500,000
# of Employees 12
Plant Area (Sq.Ft.) 20,000
Annual Production 1 Units
Production Hrs. Annual 8,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $99,371 1,066,592 kWh $0.09
Electricity Demand $8,751 2,337 kW-months/year $3.74
Natural Gas $47,989 4,258 MMBtu $11.27
TOTAL ENERGY COSTS $156,111
RECOMMENDED SAVINGS* $47,348 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,794
Cost:
$5,642
- - - - $2,794 248 -
-
kWh
-
-
kW-months/year
$2,794
248
MMBtu
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$17,333
Cost:
$125,000
$15,116 162,548 $2,217 593 - - $15,116
162,548
kWh
$2,217
593
kW-months/year
-
-
MMBtu
03: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$3,721
Cost:
$34,860
$3,721 40,019 - - - - $3,721
40,019
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$412
Cost:
$950
$412 4,414 - - - - $412
4,414
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,690
Cost:
$3,100
$2,690 28,873 - - - - $2,690
28,873
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$20,398
Cost:
$146,247
$19,118 205,562 $1,280 342 - - $19,118
205,562
kWh
$1,280
342
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$47,348
Cost:
$315,799
$41,057 441,416 $3,497 935 $2,794 248 $41,057
441,416
kWh
$3,497
935
kW-months/year
$2,794
248
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas