IAC logo
IAC Assessment: ND0343
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0343
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 2000
Principal Product Die cast Aluminum
NAICS n/a
SIC 3365 - Aluminum Foundries
Sales $50,000,000-$100,000,000
# of Employees 630
Plant Area (Sq.Ft.) 480,000
Annual Production 9,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $917,589 50,178,195 kWh $0.02
Electricity Demand $878,565 93,687 kW-months/year $9.38
Electricity Fees $40,354 - $ -
Natural Gas $1,199,398 430,307 MMBtu $2.79
TOTAL ENERGY COSTS $3,035,906
RECOMMENDED SAVINGS* $70,409 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$27,009
Cost:
$4,500
$17,342 802,462 $9,667 1,201 - - - - $17,342
802,462
kWh
$9,667
1,201
kW-months/year
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,145
Cost:
$400
$2,145 98,183 - - - - - - $2,145
98,183
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$507
Cost:
$40
$342 12,309 $165 34 - - - - $342
12,309
kWh
$165
34
kW-months/year
-
-
$
-
-
$
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$8,389
Cost:
$43,959
$4,440 277,550 $3,949 381 - - - - $4,440
277,550
kWh
$3,949
381
kW-months/year
-
-
$
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,327
Cost:
$22,922
- - - - $11,327 - - - -
-
kWh
-
-
kW-months/year
$11,327
-
$
-
-
$
06: 4.425 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$(-3,501)
Cost:
$6,210
- - - - - - $(-3,501) - -
-
kWh
-
-
kW-months/year
-
-
$
$(-3,501)
-
$
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$24,533
Cost:
$250
- - - - $24,533 - - - -
-
kWh
-
-
kW-months/year
$24,533
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$70,409
Cost:
$78,281
$24,269 1,190,504 $13,781 1,616 $35,860 - $(-3,501) - $24,269
1,190,504
kWh
$13,781
1,616
kW-months/year
$35,860
-
$
$(-3,501)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes