Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nebraska–Lincoln |
---|---|
Assessment Year | 2022 |
Principal Product | Sliced Bacon |
NAICS | 311612 - Meat Processed from Carcasses |
SIC | 2013 - Sausages And Other Prepared Meats |
Sales | >$500,000,000 |
# of Employees | 225 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 120,000,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $313,279 | 9,394,238 | kWh | $0.03 |
Electricity Demand | $192,285 | 16,328 | kW-months/year | $11.78 |
Electricity Fees | $2,955 | - | $ | - |
Natural Gas | $161,842 | 32,648 | MMBtu | $4.96 |
TOTAL ENERGY COSTS | $846,160 | |||
RECOMMENDED SAVINGS* | $83,244 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $83,244 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Usage | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | Water Usage | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.3123 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS |
Savings: $79,442 Cost: $292,000 |
- | - | - | - | - | - | $79,442 | - |
- - kWh |
- - MMBtu |
- - Tgal |
$79,442 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,251 Cost: $1,729 |
$1,251 | 37,909 | - | - | - | - | - | - |
$1,251 37,909 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,248 Cost: $2,875 |
$1,248 | 37,829 | - | - | - | - | - | - |
$1,248 37,829 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.7193 USE HIGH PRESSURE WASH SYSTEMS |
Savings: $768 Cost: $240 |
- | - | $298 | 60 | $207 | 88 | $263 | - |
- - kWh |
$298 60 MMBtu |
$207 88 Tgal |
$263 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $331 Cost: $90 |
- | - | - | - | - | - | $331 | - |
- - kWh |
- - MMBtu |
- - Tgal |
$331 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $204 Cost: $130 |
- | - | $204 | 41 | - | - | - | - |
- - kWh |
$204 41 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $83,244 Cost: $297,064 |
$2,499 | 75,738 | $502 | 101 | $207 | 88 | $80,036 | - | $2,499 75,738 kWh |
$502 101 MMBtu |
$207 88 Tgal |
$80,036 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $83,244 Cost: $297,064 |
$2,499 | 75,738 | $502 | 101 | $207 | 88 | $80,036 | - | $2,499 75,738 kWh |
$502 101 MMBtu |
$207 88 Tgal |
$80,036 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Usage | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | Water Usage | One-time Revenue or Avoided Cost |