IAC Assessment: NL0073
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0073
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2022
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 7
Plant Area (Sq.Ft.) 300,000
Annual Production 584,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $93,986 1,592,983 kWh $0.06
Electricity Demand $24,827 1,439 kW-months/year $17.25
Natural Gas $99,142 10,312 MMBtu $9.61
TOTAL ENERGY COSTS $262,344
RECOMMENDED SAVINGS* $30,908 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,670
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$16,217
Cost:
$225,000
$11,580 196,224 $4,637 269 - - - - - - $11,580
196,224
kWh
$4,637
269
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$7,537
Cost:
$35,000
$1,106 18,746 $443 26 - - - - $5,988 - $1,106
18,746
kWh
$443
26
kW-months/year
-
-
MMBtu
-
-
lb
$5,988
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$5,239
Cost:
$1,398
$(-382) (-6,481) $5,621 381 - - - - - - $(-382)
(-6,481)
kWh
$5,621
381
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 3.3133 USE OTHER WASTE CONCENTRATION METHODS Savings:
$1,144
Cost:
$1,258
- - - - $(-1,075) (-112) $2,219 24,660 - - -
-
kWh
-
-
kW-months/year
$(-1,075)
(-112)
MMBtu
$2,219
24,660
lb
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$772
Cost:
$58
- - $772 45 - - - - - - -
-
kWh
$772
45
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$30,908
Cost:
$262,714
$12,304 208,489 $11,473 720 $(-1,075) (-112) $2,219 24,660 $5,988 - $12,304
208,489
kWh
$11,473
720
kW-months/year
$(-1,075)
(-112)
MMBtu
$2,219
24,660
lb
$5,988
-
$
TOTAL IMPLEMENTED Savings:
$25,670
Cost:
$261,316
$12,686 214,970 $5,852 339 $(-1,075) (-112) $2,219 24,660 $5,988 - $12,686
214,970
kWh
$5,852
339
kW-months/year
$(-1,075)
(-112)
MMBtu
$2,219
24,660
lb
$5,988
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes