IAC Assessment: NL0087
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0087
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2023
Principal Product Cheese
NAICS 311513 - Cheese Manufacturing
SIC 2022 - Cheese, Natural And Processed
Sales $100,000,000-$500,000,000
# of Employees 175
Plant Area (Sq.Ft.) 130,000
Annual Production 81,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $692,689 12,369,450 kWh $0.06
Electricity Demand $379,863 22,227 kW-months/year $17.09
Electricity Fees $344,077 - $ -
Natural Gas $1,792,892 234,059 MMBtu $7.66
TOTAL ENERGY COSTS $3,209,521
RECOMMENDED SAVINGS* $809,266 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$491,419
Cost:
$1,990,800
$1,240,310 9,986,400 - - $(-748,891) (-56,844) - - - - - - $1,240,310
9,986,400
kWh
-
-
kW-months/year
$(-748,891)
(-56,844)
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$254,315
Cost:
$454,461
- - - - $254,315 33,196 - - - - - - -
-
kWh
-
-
kW-months/year
$254,315
33,196
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$17,666
Cost:
$50
- - - - $19,316 2,522 - - $(-1,650) - - - -
-
kWh
-
-
kW-months/year
$19,316
2,522
MMBtu
-
-
lb
$(-1,650)
-
$
-
-
$
04: 2.2696 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS Savings:
$12,625
Cost:
$8,000
$274 4,897 $12,351 723 - - - - - - - - $274
4,897
kWh
$12,351
723
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$11,616
Cost:
$7,640
- - - - $11,616 1,517 - - - - - - -
-
kWh
-
-
kW-months/year
$11,616
1,517
MMBtu
-
-
lb
-
-
$
-
-
$
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$10,817
Cost:
$3,660
- - - - - - $9,900 55,000 $917 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,900
55,000
lb
$917
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,789
Cost:
$100
$10,489 187,308 - - - - - - $(-600) - $(-100) - $10,489
187,308
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$(-600)
-
$
$(-100)
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,019
Cost:
$768
$718 12,827 $301 18 - - - - - - - - $718
12,827
kWh
$301
18
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$809,266
Cost:
$2,465,479
$1,251,791 10,191,432 $12,652 740 $(-463,644) (-19,609) $9,900 55,000 $(-1,333) - $(-100) - $1,251,791
10,191,432
kWh
$12,652
740
kW-months/year
$(-463,644)
(-19,609)
MMBtu
$9,900
55,000
lb
$(-1,333)
-
$
$(-100)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost