IAC Assessment: NL0099
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0099
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2024
Principal Product Ready to Eat Desserts
NAICS 311412 - Frozen Specialty Food Manufacturing
SIC 2024 - Ice Cream And Frozen Desserts
Sales $100,000,000-$500,000,000
# of Employees 175
Plant Area (Sq.Ft.) 226,687
Annual Production 79,122 Tons
Production Hrs. Annual 8,664
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,440,846 37,489,299 kWh $0.04
Electricity Demand $1,473,685 64,082 kW-months/year $23.00
Electricity Fees $24,482 - $ -
Natural Gas $761,074 196,442 MMBtu $3.87
Fuel Oil #1 $540,000 18,725 MMBtu $28.84
TOTAL ENERGY COSTS $4,772,212
RECOMMENDED SAVINGS* $4,674,476 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #1 One-time Revenue or Avoided Cost Electricity Usage Natural Gas Fuel Oil #1 One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ MMBtu $ $
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$3,986,937
Cost:
$49,000,000
$247,324 6,508,485 - - $540,000 18,725 $3,199,613 - $247,324
6,508,485
kWh
-
-
MMBtu
$540,000
18,725
MMBtu
$3,199,613
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$569,646
Cost:
$74,000
- - - - - - $569,646 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$569,646
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$102,668
Cost:
$214,595
- - $102,668 26,502 - - - - -
-
kWh
$102,668
26,502
MMBtu
-
-
MMBtu
-
-
$
04: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$8,784
Cost:
$35,100
- - $8,784 2,268 - - - - -
-
kWh
$8,784
2,268
MMBtu
-
-
MMBtu
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,201
Cost:
$140
$6,201 163,160 - - - - - - $6,201
163,160
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$240
Cost:
$35
- - - - - - $240 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$240
-
$
TOTAL RECOMMENDED Savings:
$4,674,476
Cost:
$49,323,870
$253,525 6,671,645 $111,452 28,769 $540,000 18,725 $3,769,499 - $253,525
6,671,645
kWh
$111,452
28,769
MMBtu
$540,000
18,725
MMBtu
$3,769,499
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #1 One-time Revenue or Avoided Cost Electricity Usage Natural Gas Fuel Oil #1 One-time Revenue or Avoided Cost