IAC logo
IAC Assessment: NT0004
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NT0004
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Texas
Assessment Year 2023
Principal Product Railroad Rolling Stock Manufacturing
NAICS 336510 - Railroad Rolling Stock Manufacturing
SIC 3743 - Railroad Equipment
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 1,000,000
Annual Production 294 Pieces
Production Hrs. Annual 4,032
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,307,419 13,979,212 kWh $0.09
Electricity Demand $347,419 38,438 kW-months/year $9.04
Electricity Fees $158,276 - $ -
Natural Gas $222,765 20,997 MMBtu $10.61
TOTAL ENERGY COSTS $2,035,879
RECOMMENDED SAVINGS* $150,675 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,687
Cost:
$5,993
$6,754 71,846 $1,933 214 $6,754
71,846
kWh
$1,933
214
kW-months/year
02: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$38,000
Cost:
$38,000
$26,600 282,878 $11,400 1,261 $26,600
282,878
kWh
$11,400
1,261
kW-months/year
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$29,874
Cost:
-
$23,999 255,312 $5,875 648 $23,999
255,312
kWh
$5,875
648
kW-months/year
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$27,237
Cost:
$63,579
- - $27,237 3,013 -
-
kWh
$27,237
3,013
kW-months/year
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$735
Cost:
-
$735 7,816 - - $735
7,816
kWh
-
-
kW-months/year
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$27,449
Cost:
-
$27,449 292,431 - - $27,449
292,431
kWh
-
-
kW-months/year
07: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION Savings:
$18,694
Cost:
-
$17,803 189,389 $892 99 $17,803
189,389
kWh
$892
99
kW-months/year
TOTAL RECOMMENDED Savings:
$150,675
Cost:
$107,572
$103,338 1,099,671 $47,337 5,234 $103,338
1,099,671
kWh
$47,337
5,234
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand