IAC logo
IAC Assessment: NT0006
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NT0006
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Texas
Assessment Year 2023
Principal Product Mining Machinery and Equipment
NAICS 333131 - Mining Machinery and Equipment Manufacturing
SIC 3532 - Mining Machinery
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 250,000
Annual Production 1,451 Pieces
Production Hrs. Annual 5,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $978,683 8,983,661 kWh $0.11
Electricity Demand $184,810 20,983 kW-months/year $8.81
Electricity Fees $93,617 - $ -
Natural Gas $8,645 814 MMBtu $10.62
TOTAL ENERGY COSTS $1,265,755
RECOMMENDED SAVINGS* $233,422 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Consumption One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ Tgal $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$34,941
Cost:
$10,056
$34,941 323,524 - - - - - - $34,941
323,524
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,685
Cost:
-
$1,685 15,476 - - - - - - $1,685
15,476
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$15,942
Cost:
-
$15,942 146,390 - - - - - - $15,942
146,390
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,361
Cost:
$27,064
- - $12,361 1,403 - - - - -
-
kWh
$12,361
1,403
kW-months/year
-
-
Tgal
-
-
$
05: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION Savings:
$16,552
Cost:
-
$15,683 144,014 $869 99 - - - - $15,683
144,014
kWh
$869
99
kW-months/year
-
-
Tgal
-
-
$
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$151,941
Cost:
$2,205,000
$34,475 316,577 $11,602 1,317 $57,864 - $48,000 - $34,475
316,577
kWh
$11,602
1,317
kW-months/year
$57,864
-
Tgal
$48,000
-
$
TOTAL RECOMMENDED Savings:
$233,422
Cost:
$2,242,120
$102,726 945,981 $24,832 2,819 $57,864 - $48,000 - $102,726
945,981
kWh
$24,832
2,819
kW-months/year
$57,864
-
Tgal
$48,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Consumption One-time Revenue or Avoided Cost