IAC logo
IAC Assessment: NT0015
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NT0015
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Texas
Assessment Year 2023
Principal Product Sheet Metal Work Manufacturing
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 68
Plant Area (Sq.Ft.) 70,200
Annual Production 1,000,000 Units
Production Hrs. Annual 3,312
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,890 1,722,000 kWh $0.04
Electricity Demand $58,847 6,138 kW-months/year $9.59
Electricity Fees $2,778 - $ -
Natural Gas $31,072 27,331 MMBtu $1.14
TOTAL ENERGY COSTS $162,587
RECOMMENDED SAVINGS* $18,585 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,648
Cost:
$5,609
$1,975 48,173 $1,673 174 - - - - $1,975
48,173
kWh
$1,673
174
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,915
Cost:
$5,598
- - $9,915 1,034 - - - - -
-
kWh
$9,915
1,034
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,242
Cost:
$1,258
- - - - $1,242 1,092 - - -
-
kWh
-
-
kW-months/year
$1,242
1,092
MMBtu
-
-
$
04: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$2,030
Cost:
$2,800
$840 20,488 $1,190 124 - - - - $840
20,488
kWh
$1,190
124
kW-months/year
-
-
MMBtu
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$349
Cost:
-
- - - - - - $349 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$349
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,401
Cost:
-
$1,401 34,182 - - - - - - $1,401
34,182
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$18,585
Cost:
$15,265
$4,217 102,842 $12,777 1,333 $1,242 1,092 $349 - $4,217
102,842
kWh
$12,777
1,333
kW-months/year
$1,242
1,092
MMBtu
$349
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost