IAC logo
IAC Assessment: NT0032
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NT0032
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Texas
Assessment Year 2024
Principal Product Sucker Rod
NAICS 213112 - Support Activities for Oil and Gas Operations
SIC 1389 - Oil And Gas Field Services, Nec
Sales $10,000,000-$50,000,000
# of Employees 59
Plant Area (Sq.Ft.) 360,000
Annual Production 240,000 Units
Production Hrs. Annual 4,420
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $349,582 5,462,700 kWh $0.06
Electricity Demand $277,809 19,204 kW-months/year $14.47
Electricity Fees $38,359 - $ -
Natural Gas $329,073 563,430 MMBtu $0.58
TOTAL ENERGY COSTS $994,823
RECOMMENDED SAVINGS* $37,036 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,842
Cost:
$5,609
$4,859 75,924 $2,983 206 - - $4,859
75,924
kWh
$2,983
206
kW-months/year
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$24,030
Cost:
-
$14,890 232,658 $9,140 632 - - $14,890
232,658
kWh
$9,140
632
kW-months/year
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,332
Cost:
-
$1,332 20,661 - - - - $1,332
20,661
kWh
-
-
kW-months/year
-
-
$
04: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$1,001
Cost:
$2,500
- - - - $1,001 - -
-
kWh
-
-
kW-months/year
$1,001
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,831
Cost:
$2,669
$2,162 33,775 $669 46 - - $2,162
33,775
kWh
$669
46
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$37,036
Cost:
$10,778
$23,243 363,019 $12,792 884 $1,001 - $23,243
363,019
kWh
$12,792
884
kW-months/year
$1,001
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees