IAC Assessment: NV0036
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0036
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1995
Principal Product Breakfast Cereals
NAICS n/a
SIC 2043 - Cereal Breakfast Foods
Sales $50,000,000-$100,000,000
# of Employees 170
Plant Area (Sq.Ft.) 237,000
Annual Production 70,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,003,539 15,445,487 kWh $0.06
Natural Gas $452,041 105,743 MMBtu $4.27
TOTAL ENERGY COSTS $1,455,580
RECOMMENDED SAVINGS* $368,372 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,482
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,062
Cost:
$4,800
$10,062 219,812 - - $10,062
219,812
kWh
-
-
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$817
Cost:
$320
- - $817 191 -
-
kWh
$817
191
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$420
Cost:
-
$420 9,086 - - $420
9,086
kWh
-
-
MMBtu
04: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$8,102
Cost:
$62,000
- - $8,102 1,895 -
-
kWh
$8,102
1,895
MMBtu
05: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$348,971
Cost:
$3,100,000
$452,041 9,778,722 $(-103,070) (-24,096) $452,041
9,778,722
kWh
$(-103,070)
(-24,096)
MMBtu
TOTAL RECOMMENDED Savings:
$368,372
Cost:
$3,167,120
$462,523 10,007,620 $(-94,151) (-22,010) $462,523
10,007,620
kWh
$(-94,151)
(-22,010)
MMBtu
TOTAL IMPLEMENTED Savings:
$10,482
Cost:
$4,800
$10,482 228,898 - - $10,482
228,898
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas