Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nevada |
---|---|
Assessment Year | 1996 |
Principal Product | Vacuum Pumps & Cryogenic Compressors |
NAICS | n/a |
SIC | 3568 - Power Transmission Equipment, Nec |
Sales | n/a |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 3,600 Pieces |
Production Hrs. Annual | 7,410 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $196,172 | 3,307,737 | kWh | $0.06 |
Electricity Demand | $43,193 | 6,218 | kW-months/year | $6.95 |
Electricity Fees | $1,151 | - | $ | - |
Natural Gas | $6,645 | 997 | MMBtu | $6.66 |
TOTAL ENERGY COSTS | $253,761 | |||
RECOMMENDED SAVINGS* | $23,362 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,015 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Gaseous Waste | Electricity Usage | Electricity Demand | Gaseous Waste | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $368 Cost: $260 |
$368 | 6,155 | - | - | - | - |
$368 6,155 kWh |
- - kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,415 Cost: $600 |
$1,415 | 23,740 | - | - | - | - |
$1,415 23,740 kWh |
- - kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,010 Cost: $1,600 |
$4,010 | 176,729 | - | - | - | - |
$4,010 176,729 kWh |
- - kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $9,058 Cost: $200 |
$6,966 | 117,526 | $2,092 | 301 | - | - |
$6,966 117,526 kWh |
$2,092 301 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $492 Cost: $163 |
$401 | 6,741 | $91 | 13 | - | - |
$401 6,741 kWh |
$91 13 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $1,419 Cost: $3,575 |
$1,419 | 69,461 | - | - | - | - |
$1,419 69,461 kWh |
- - kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $6,600 Cost: $600 |
- | - | - | - | $6,600 | 4,400 |
- - kWh |
- - kW-months/year |
$6,600 4,400 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $23,362 Cost: $6,998 |
$14,579 | 400,352 | $2,183 | 314 | $6,600 | 4,400 | $14,579 400,352 kWh |
$2,183 314 kW-months/year |
$6,600 4,400 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,015 Cost: $1,200 |
$1,415 | 23,740 | - | - | $6,600 | 4,400 | $1,415 23,740 kWh |
- - kW-months/year |
$6,600 4,400 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Gaseous Waste | Electricity Usage | Electricity Demand | Gaseous Waste |