IAC logo
IAC Assessment: NV0079
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0079
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1997
Principal Product Pressure treated wood products
NAICS n/a
SIC 2491 - Wood Preserving
Sales $1,000,000-$5,000,000
# of Employees 26
Plant Area (Sq.Ft.) 350,000
Annual Production 1,500,000 Units
Production Hrs. Annual 8,760
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,012 623,388 kWh $0.05
Electricity Demand $15,516 1,687 kW-months/year $9.20
Electricity Fees $1,349 - $ -
Natural Gas $88,638 16,938 MMBtu $5.23
TOTAL ENERGY COSTS $134,515
RECOMMENDED SAVINGS* $31,508 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,533
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,890
Cost:
$9,124
- - - - $8,890 1,733 - - - - -
-
kWh
-
-
kW-months/year
$8,890
1,733
MMBtu
-
-
lb
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$13,870
Cost:
$7,320
- - - - $13,870 2,766 - - - - -
-
kWh
-
-
kW-months/year
$13,870
2,766
MMBtu
-
-
lb
-
-
$
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,071
Cost:
$250
- - - - $1,071 214 - - - - -
-
kWh
-
-
kW-months/year
$1,071
214
MMBtu
-
-
lb
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$325
Cost:
$409
- - - - $325 65 - - - - -
-
kWh
-
-
kW-months/year
$325
65
MMBtu
-
-
lb
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$896
Cost:
$196
$737 15,826 $159 17 - - - - - - $737
15,826
kWh
$159
17
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,129
Cost:
$3,350
- - - - $3,129 624 - - - - -
-
kWh
-
-
kW-months/year
$3,129
624
MMBtu
-
-
lb
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$137
Cost:
$10
$137 2,931 - - - - - - - - $137
2,931
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
08: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$840
Cost:
$408
- - - - - - $840 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$840
-
lb
-
-
$
09: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$2,350
Cost:
-
- - - - - - - - $2,350 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$2,350
-
$
TOTAL RECOMMENDED Savings:
$31,508
Cost:
$21,067
$874 18,757 $159 17 $27,285 5,402 $840 - $2,350 - $874
18,757
kWh
$159
17
kW-months/year
$27,285
5,402
MMBtu
$840
-
lb
$2,350
-
$
TOTAL IMPLEMENTED Savings:
$1,533
Cost:
$669
$137 2,931 - - $1,396 279 - - - - $137
2,931
kWh
-
-
kW-months/year
$1,396
279
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes