IAC Assessment: NV0080
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0080
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1997
Principal Product Aftermarket and OEM vehicle fuel tanks
NAICS n/a
SIC 3417 -
Sales $1,000,000-$5,000,000
# of Employees 37
Plant Area (Sq.Ft.) 30,000
Annual Production 1,090,000 Pounds
Production Hrs. Annual 2,210
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $25,091 297,773 kWh $0.08
Electricity Demand $5,238 1,387 kW-months/year $3.78
Electricity Fees $2,522 - $ -
Natural Gas $7,762 1,331 MMBtu $5.83
TOTAL ENERGY COSTS $40,613
RECOMMENDED SAVINGS* $19,489 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,761
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.2525 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA Savings:
$1,252
Cost:
$200
- - - - $1,252 226 - - - - -
-
kWh
-
-
kW-months/year
$1,252
226
MMBtu
-
-
lb
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$728
Cost:
$50
$608 7,327 $120 32 - - - - - - $608
7,327
kWh
$120
32
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,478
Cost:
$125
$762 9,086 $716 190 - - - - - - $762
9,086
kWh
$716
190
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$729
Cost:
$100
- - - - $729 131 - - - - -
-
kWh
-
-
kW-months/year
$729
131
MMBtu
-
-
lb
-
-
$
05: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$336
Cost:
$100
- - - - - - $336 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$336
-
lb
-
-
$
06: 4.425 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$14,966
Cost:
$7,500
- - - - - - - - $14,966 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$14,966
-
$
TOTAL RECOMMENDED Savings:
$19,489
Cost:
$8,075
$1,370 16,413 $836 222 $1,981 357 $336 - $14,966 - $1,370
16,413
kWh
$836
222
kW-months/year
$1,981
357
MMBtu
$336
-
lb
$14,966
-
$
TOTAL IMPLEMENTED Savings:
$18,761
Cost:
$8,025
$762 9,086 $716 190 $1,981 357 $336 - $14,966 - $762
9,086
kWh
$716
190
kW-months/year
$1,981
357
MMBtu
$336
-
lb
$14,966
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes