IAC Assessment: NV0091
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0091
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1997
Principal Product Hot-Melt Adhesives
NAICS n/a
SIC 2891 - Adhesives And Sealants
Sales $10,000,000-$50,000,000
# of Employees 20
Plant Area (Sq.Ft.) 30,000
Annual Production 13,500,000 Pounds
Production Hrs. Annual 6,528
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,153 707,796 kWh $0.04
Electricity Demand $20,611 2,221 kW-months/year $9.28
Electricity Fees $1,635 - $ -
Natural Gas $31,681 6,073 MMBtu $5.22
TOTAL ENERGY COSTS $85,080
RECOMMENDED SAVINGS* $13,277 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,838
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,073
Cost:
$245
$2,935 66,823 $1,138 123 - - - - - - $2,935
66,823
kWh
$1,138
123
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$425
Cost:
$62
$332 7,620 $93 10 - - - - - - $332
7,620
kWh
$93
10
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,435
Cost:
$380
- - - - $6,435 1,093 - - - - -
-
kWh
-
-
kW-months/year
$6,435
1,093
MMBtu
-
-
Tgal
-
-
$
04: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$1,330
Cost:
$400
- - - - $1,330 261 - - - - -
-
kWh
-
-
kW-months/year
$1,330
261
MMBtu
-
-
Tgal
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$262
Cost:
$500
$262 5,862 - - - - - - - - $262
5,862
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 3.4151 MINIMIZE WATER USAGE Savings:
$170
Cost:
$900
- - - - - - $170 60,192 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$170
60,192
Tgal
-
-
$
07: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$582
Cost:
$220
- - - - - - - - $582 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$582
-
$
TOTAL RECOMMENDED Savings:
$13,277
Cost:
$2,707
$3,529 80,305 $1,231 133 $7,765 1,354 $170 60,192 $582 - $3,529
80,305
kWh
$1,231
133
kW-months/year
$7,765
1,354
MMBtu
$170
60,192
Tgal
$582
-
$
TOTAL IMPLEMENTED Savings:
$11,838
Cost:
$1,025
$2,935 66,823 $1,138 123 $7,765 1,354 - - - - $2,935
66,823
kWh
$1,138
123
kW-months/year
$7,765
1,354
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost