Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nevada |
---|---|
Assessment Year | 1998 |
Principal Product | Remanufactured Industrial Parts |
NAICS | n/a |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 40 |
Plant Area (Sq.Ft.) | 25,000 |
Annual Production | 38,000,000 Units |
Production Hrs. Annual | 6,214 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $49,214 | 836,166 | kWh | $0.06 |
Electricity Demand | $15,056 | 2,327 | kW-months/year | $6.47 |
Electricity Fees | $5,219 | - | $ | - |
Natural Gas | $1,133 | 137 | MMBtu | $8.27 |
TOTAL ENERGY COSTS | $70,622 | |||
RECOMMENDED SAVINGS* | $17,707 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $16,517 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,042 Cost: $768 |
$776 | 13,189 | $192 | 25 | $74 | - | - | - |
$776 13,189 kWh |
$192 25 kW-months/year |
$74 - $ |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3522 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES |
Savings: $11,472 Cost: $15,808 |
$7,079 | 120,164 | $3,570 | 466 | $823 | - | - | - |
$7,079 120,164 kWh |
$3,570 466 kW-months/year |
$823 - $ |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $259 Cost: - |
$192 | 3,224 | $48 | 6 | $19 | - | - | - |
$192 3,224 kWh |
$48 6 kW-months/year |
$19 - $ |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,992 Cost: $350 |
$2,158 | 36,635 | $1,549 | 202 | $285 | - | - | - |
$2,158 36,635 kWh |
$1,549 202 kW-months/year |
$285 - $ |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $148 Cost: $252 |
$110 | 1,758 | $28 | 4 | $10 | - | - | - |
$110 1,758 kWh |
$28 4 kW-months/year |
$10 - $ |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $794 Cost: $220 |
- | - | - | - | - | - | $794 | 11,000 |
- - kWh |
- - kW-months/year |
- - $ |
$794 11,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $17,707 Cost: $17,398 |
$10,315 | 174,970 | $5,387 | 703 | $1,211 | - | $794 | 11,000 | $10,315 174,970 kWh |
$5,387 703 kW-months/year |
$1,211 - $ |
$794 11,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $16,517 Cost: $16,378 |
$9,429 | 160,023 | $5,167 | 674 | $1,127 | - | $794 | 11,000 | $9,429 160,023 kWh |
$5,167 674 kW-months/year |
$1,127 - $ |
$794 11,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) |