Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1998
Principal Product Plastic Products
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 98
Plant Area (Sq.Ft.) 43,000
Annual Production 50,000 Pieces
Production Hrs. Annual 8,736
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $92,621 2,219,519 kWh $0.04
Electricity Demand $44,720 4,819 kW-months/year $9.28
Electricity Fees $3,359 - $ -
Natural Gas $1,006 160 MMBtu $6.29
LPG $3,416 181 MMBtu $18.87
TOTAL ENERGY COSTS $146,542
RECOMMENDED SAVINGS* $662,050 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,560
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Increase in Production Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Increase in Production
$ kWh $ kW-months/year $ $ $ Tgal $ lb $ %
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$544
Cost:
$2,000
$408 9,672 $125 13 $11 - - - - - - - $408
9,672
kWh
$125
13
kW-months/year
$11
-
$
-
-
Tgal
-
-
lb
-
-
%
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$282
Cost:
$736
$171 4,103 $105 11 $6 - - - - - - - $171
4,103
kWh
$105
11
kW-months/year
$6
-
$
-
-
Tgal
-
-
lb
-
-
%
03: 4.4240 IMPROVE SPACE COMFORT CONDITIONING Savings:
$16,667
Cost:
$9,361
- - - - - - - - - - $16,667 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
$16,667
-
%
04: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$87,965
Cost:
$255
- - - - - - - - - - $87,965 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
$87,965
-
%
05: 4.3230 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS Savings:
$550,755
Cost:
$48,000
- - - - - - - - - - $550,755 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
$550,755
-
%
06: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$1,277
Cost:
$230
- - - - - - $1,277 889,100 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,277
889,100
Tgal
-
-
lb
-
-
%
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$4,560
Cost:
-
- - - - - - - - $4,560 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$4,560
-
lb
-
-
%
TOTAL RECOMMENDED Savings:
$662,050
Cost:
$60,582
$579 13,775 $230 24 $17 - $1,277 889,100 $4,560 - $655,387 - $579
13,775
kWh
$230
24
kW-months/year
$17
-
$
$1,277
889,100
Tgal
$4,560
-
lb
$655,387
-
%
TOTAL IMPLEMENTED Savings:
$4,560
Cost:
-
- - - - - - - - $4,560 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$4,560
-
lb
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal $ lb $ %
Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Increase in Production Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Increase in Production