IAC logo
IAC Assessment: NV0131
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0131
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1999
Principal Product Asphalt Paving Mixtures, Concrete Ready-Mix
NAICS n/a
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 0
Annual Production 100,000 Tons
Production Hrs. Annual 4,368
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $48,667 1,114,889 kWh $0.04
Electricity Demand $59,932 9,460 kW-months/year $6.34
Electricity Fees $4,270 - $ -
Natural Gas $28,159 4,515 MMBtu $6.24
TOTAL ENERGY COSTS $141,028
RECOMMENDED SAVINGS* $27,434 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,159
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$105
Cost:
$200
- - - - - - $105 18 - - -
-
kWh
-
-
kW-months/year
-
-
$
$105
18
MMBtu
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,146
Cost:
$1,933
- - - - $1,146 - - - - - -
-
kWh
-
-
kW-months/year
$1,146
-
$
-
-
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,277
Cost:
$638
$836 19,050 $441 70 - - - - - - $836
19,050
kWh
$441
70
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$111
Cost:
$80
$72 1,758 $39 6 - - - - - - $72
1,758
kWh
$39
6
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$327
Cost:
-
$213 4,982 $114 18 - - - - - - $213
4,982
kWh
$114
18
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$444
Cost:
$50
$289 6,741 $155 24 - - - - - - $289
6,741
kWh
$155
24
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$24,024
Cost:
$20,320
- - - - - - - - $24,024 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$24,024
-
$
TOTAL RECOMMENDED Savings:
$27,434
Cost:
$23,221
$1,410 32,531 $749 118 $1,146 - $105 18 $24,024 - $1,410
32,531
kWh
$749
118
kW-months/year
$1,146
-
$
$105
18
MMBtu
$24,024
-
$
TOTAL IMPLEMENTED Savings:
$2,159
Cost:
$768
$1,410 32,531 $749 118 - - - - - - $1,410
32,531
kWh
$749
118
kW-months/year
-
-
$
-
-
MMBtu
-
-
$