Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nevada |
---|---|
Assessment Year | 1999 |
Principal Product | Computer Storage Devices |
NAICS | n/a |
SIC | 3572 - Computer Storage Devices |
Sales | $50,000,000-$100,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 50,250,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $127,982 | 2,748,535 | kWh | $0.05 |
Electricity Demand | $53,116 | 6,518 | kW-months/year | $8.15 |
Electricity Fees | $16,131 | - | $ | - |
Natural Gas | $28,699 | 4,552 | MMBtu | $6.30 |
TOTAL ENERGY COSTS | $225,928 | |||
RECOMMENDED SAVINGS* | $18,561 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,016 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $3,174 Cost: $1,500 |
$1,465 | 31,653 | $1,482 | 181 | $227 | - | - | - | - | - |
$1,465 31,653 kWh |
$1,482 181 kW-months/year |
$227 - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,742 Cost: $900 |
$1,989 | 42,790 | $1,485 | 182 | $268 | - | - | - | - | - |
$1,989 42,790 kWh |
$1,485 182 kW-months/year |
$268 - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $10,471 Cost: $15,285 |
$7,846 | 168,523 | $1,860 | 228 | $765 | - | - | - | - | - |
$7,846 168,523 kWh |
$1,860 228 kW-months/year |
$765 - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $274 Cost: - |
- | - | - | - | - | - | - | - | $274 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - lb |
$274 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $900 Cost: - |
- | - | - | - | - | - | $900 | 21,750 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$900 21,750 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $18,561 Cost: $17,685 |
$11,300 | 242,966 | $4,827 | 591 | $1,260 | - | $900 | 21,750 | $274 | - | $11,300 242,966 kWh |
$4,827 591 kW-months/year |
$1,260 - $ |
$900 21,750 lb |
$274 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,016 Cost: $900 |
$1,989 | 42,790 | $1,485 | 182 | $268 | - | - | - | $274 | - | $1,989 42,790 kWh |
$1,485 182 kW-months/year |
$268 - $ |
- - lb |
$274 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Administrative Changes |