Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nevada |
---|---|
Assessment Year | 2000 |
Principal Product | instruments to measure electricity |
NAICS | n/a |
SIC | 3825 - Instruments To Measure Electricity |
Sales | $5,000,000-$10,000,000 |
# of Employees | 65 |
Plant Area (Sq.Ft.) | 20,000 |
Annual Production | 150,000 Pieces |
Production Hrs. Annual | 4,420 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $29,742 | 346,000 | kWh | $0.09 |
Electricity Demand | $3,920 | 904 | kW-months/year | $4.34 |
Electricity Fees | $724 | - | $ | - |
Natural Gas | $2,085 | 259 | MMBtu | $8.05 |
TOTAL ENERGY COSTS | $40,241 | |||
RECOMMENDED SAVINGS* | $6,597 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,053 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,639 Cost: $200 |
$2,379 | 29,308 | $254 | 59 | $6 | - | - | - | - | - |
$2,379 29,308 kWh |
$254 59 kW-months/year |
$6 - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $414 Cost: $50 |
$373 | 4,689 | $40 | 9 | $1 | - | - | - | - | - |
$373 4,689 kWh |
$40 9 kW-months/year |
$1 - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $229 Cost: - |
- | - | - | - | - | - | $229 | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$229 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $3,315 Cost: $680 |
- | - | - | - | - | - | - | - | $3,315 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - lb |
$3,315 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $6,597 Cost: $930 |
$2,752 | 33,997 | $294 | 68 | $7 | - | $229 | - | $3,315 | - | $2,752 33,997 kWh |
$294 68 kW-months/year |
$7 - $ |
$229 - lb |
$3,315 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,053 Cost: $250 |
$2,752 | 33,997 | $294 | 68 | $7 | - | - | - | - | - | $2,752 33,997 kWh |
$294 68 kW-months/year |
$7 - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Personnel Changes |