IAC Assessment: OD0101
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0101
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1998
Principal Product Boat Building and Repair
NAICS n/a
SIC 3732 - Boat Building And Repairing
Sales $10,000,000-$50,000,000
# of Employees 98
Plant Area (Sq.Ft.) 21,000
Annual Production 50 Pieces
Production Hrs. Annual 2,210
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,891 798,066 kWh $0.05
Electricity Demand $19,592 3,180 kW-months/year $6.16
Electricity Fees $5,202 - $ -
Fuel Oil #2 $36,630 6,491 MMBtu $5.64
Other Gas $2,278 344 MMBtu $6.62
TOTAL ENERGY COSTS $155,935
RECOMMENDED SAVINGS* $173,667 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $156,003
#|Description Savings
Cost
Status Other Gas Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Primary Raw Material By-product Production Other Gas Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Primary Raw Material By-product Production
$ MMBtu $ gal $ gal $ lb $ $ $ $
01: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$5,664
Cost:
$28,850
$2,278 344 $3,386 18,311 - - - - - - - - $2,278
344
MMBtu
$3,386
18,311
gal
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$106,000
Cost:
$252,000
- - - - - - - - $106,000 - - - -
-
MMBtu
-
-
gal
-
-
gal
-
-
lb
$106,000
-
$
-
-
$
03: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$33,876
Cost:
-
- - - - - - $33,876 2,258 - - - - -
-
MMBtu
-
-
gal
-
-
gal
$33,876
2,258
lb
-
-
$
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$16,127
Cost:
-
- - - - $16,127 87,942 - - - - - - -
-
MMBtu
-
-
gal
$16,127
87,942
gal
-
-
lb
-
-
$
-
-
$
05: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$12,000
Cost:
-
- - - - - - - - - - $12,000 - -
-
MMBtu
-
-
gal
-
-
gal
-
-
lb
-
-
$
$12,000
-
$
TOTAL RECOMMENDED Savings:
$173,667
Cost:
$280,850
$2,278 344 $3,386 18,311 $16,127 87,942 $33,876 2,258 $106,000 - $12,000 - $2,278
344
MMBtu
$3,386
18,311
gal
$16,127
87,942
gal
$33,876
2,258
lb
$106,000
-
$
$12,000
-
$
TOTAL IMPLEMENTED Savings:
$156,003
Cost:
$252,000
- - - - $16,127 87,942 $33,876 2,258 $106,000 - - - -
-
MMBtu
-
-
gal
$16,127
87,942
gal
$33,876
2,258
lb
$106,000
-
$
-
-
$
Savings
Cost
$ MMBtu $ gal $ gal $ lb $ $ $ $
Other Gas Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Primary Raw Material By-product Production Other Gas Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Primary Raw Material By-product Production