IAC logo
IAC Assessment: OD0128
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0128
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1999
Principal Product Structural Lumber
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 54
Plant Area (Sq.Ft.) 50,000
Annual Production 35,000,000 Units
Production Hrs. Annual 2,375
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $168,066 4,168,816 kWh $0.04
Electricity Demand $149,218 17,539 kW-months/year $8.51
Electricity Fees $4,283 - $ -
Natural Gas $4,531 644 MMBtu $7.04
TOTAL ENERGY COSTS $326,098
RECOMMENDED SAVINGS* $32,585 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost By-product Production Electricity Usage Electricity Demand One-time Revenue or Avoided Cost By-product Production
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,386
Cost:
$1,800
$3,386 84,115 - - - - - - $3,386
84,115
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$854
Cost:
$1,290
$377 9,379 $477 56 - - - - $377
9,379
kWh
$477
56
kW-months/year
-
-
$
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$565
Cost:
$420
$565 18,757 - - - - - - $565
18,757
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$26,400
Cost:
$47,500
- - - - $26,400 - - - -
-
kWh
-
-
kW-months/year
$26,400
-
$
-
-
$
05: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$1,380
Cost:
$1,155
- - - - - - $1,380 - -
-
kWh
-
-
kW-months/year
-
-
$
$1,380
-
$
TOTAL RECOMMENDED Savings:
$32,585
Cost:
$52,165
$4,328 112,251 $477 56 $26,400 - $1,380 - $4,328
112,251
kWh
$477
56
kW-months/year
$26,400
-
$
$1,380
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost By-product Production Electricity Usage Electricity Demand One-time Revenue or Avoided Cost By-product Production