IAC Assessment: OK0070
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0070
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1983
Principal Product PRINTED CATALOGS
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 0
Annual Production 17,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $282,297 7,745,604 kWh $0.04
Natural Gas $190,095 62,137 MMBtu $3.06
TOTAL ENERGY COSTS $472,392
RECOMMENDED SAVINGS* $22,940 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,516
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,791
Cost:
$60
$3,791 121,630 - - $3,791
121,630
kWh
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$297
Cost:
$392
$297 8,206 - - $297
8,206
kWh
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$163
Cost:
$475
$163 4,396 - - $163
4,396
kWh
-
-
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$197
Cost:
$475
- - $197 64 -
-
kWh
$197
64
MMBtu
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$4,660
Cost:
$14,963
$4,660 119,871 - - $4,660
119,871
kWh
-
-
MMBtu
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$3,156
Cost:
$1,000
- - $3,156 1,031 -
-
kWh
$3,156
1,031
MMBtu
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,612
Cost:
$2,173
$1,612 - - - $1,612
-
kWh
-
-
MMBtu
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$9,064
Cost:
$53,000
- - $9,064 2,962 -
-
kWh
$9,064
2,962
MMBtu
TOTAL RECOMMENDED Savings:
$22,940
Cost:
$72,538
$10,523 254,103 $12,417 4,057 $10,523
254,103
kWh
$12,417
4,057
MMBtu
TOTAL IMPLEMENTED Savings:
$13,516
Cost:
$18,588
$10,360 249,707 $3,156 1,031 $10,360
249,707
kWh
$3,156
1,031
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas