IAC logo
IAC Assessment: OK0166
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0166
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1985
Principal Product FLUID DAIRY PRODUCTS
NAICS n/a
SIC 2026 - Fluid Milk
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 18,720 Thousand Gallons
Production Hrs. Annual 7,488
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $258,083 4,660,024 kWh $0.06
Natural Gas $72,278 19,628 MMBtu $3.68
TOTAL ENERGY COSTS $330,361
RECOMMENDED SAVINGS* $52,412 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,327
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$3,054
Cost:
$850
- - $2,307 624 $747 - -
-
kWh
$2,307
624
MMBtu
$747
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$34,175
Cost:
$6,260
$34,175 - - - - - $34,175
-
kWh
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,377
Cost:
$2,398
$4,866 89,977 $511 138 - - $4,866
89,977
kWh
$511
138
MMBtu
-
-
$
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$1,074
Cost:
$403
- - $1,074 290 - - -
-
kWh
$1,074
290
MMBtu
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,782
Cost:
$30,000
- - $7,782 2,103 - - -
-
kWh
$7,782
2,103
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$950
Cost:
$624
$950 17,585 - - - - $950
17,585
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$52,412
Cost:
$40,535
$39,991 107,562 $11,674 3,155 $747 - $39,991
107,562
kWh
$11,674
3,155
MMBtu
$747
-
$
TOTAL IMPLEMENTED Savings:
$6,327
Cost:
$3,022
$5,816 107,562 $511 138 - - $5,816
107,562
kWh
$511
138
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes