IAC Assessment: OK0183
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0183
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1986
Principal Product ROTARY DRILL BITS
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $10,000,000-$50,000,000
# of Employees 320
Plant Area (Sq.Ft.) 0
Annual Production 43,800 Pieces
Production Hrs. Annual 8,736
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $269,817 4,548,066 kWh $0.06
Natural Gas $107,183 29,660 MMBtu $3.61
TOTAL ENERGY COSTS $377,000
RECOMMENDED SAVINGS* $55,721 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,273
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$791
Cost:
-
$1,291 33,998 - - $(-500) - $1,291
33,998
kWh
-
-
MMBtu
$(-500)
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,482
Cost:
$845
$1,482 38,980 - - - - $1,482
38,980
kWh
-
-
MMBtu
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$13,118
Cost:
$36,015
- - $13,118 3,732 - - -
-
kWh
$13,118
3,732
MMBtu
-
-
$
04: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$6,158
Cost:
$5,270
- - $6,158 1,752 - - -
-
kWh
$6,158
1,752
MMBtu
-
-
$
05: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$34,172
Cost:
$33,600
$4,097 107,562 - - $30,075 - $4,097
107,562
kWh
-
-
MMBtu
$30,075
-
$
TOTAL RECOMMENDED Savings:
$55,721
Cost:
$75,730
$6,870 180,540 $19,276 5,484 $29,575 - $6,870
180,540
kWh
$19,276
5,484
MMBtu
$29,575
-
$
TOTAL IMPLEMENTED Savings:
$2,273
Cost:
$845
$2,773 72,978 - - $(-500) - $2,773
72,978
kWh
-
-
MMBtu
$(-500)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes