IAC logo
IAC Assessment: OK0328
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0328
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1990
Principal Product ENGINE OIL AND AIR PUMPS
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 270
Plant Area (Sq.Ft.) 0
Annual Production 5,700,000 Pieces
Production Hrs. Annual 2,080
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $725,489 15,691,091 kWh $0.05
Natural Gas $105,073 33,161 MMBtu $3.17
TOTAL ENERGY COSTS $830,562
RECOMMENDED SAVINGS* $41,189 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,730
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$38,923
Cost:
$18,700
$49,236 699,004 $(-10,313) (-2,981) - - $49,236
699,004
kWh
$(-10,313)
(-2,981)
MMBtu
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,170
Cost:
$1,500
- - $1,170 338 - - -
-
kWh
$1,170
338
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$536
Cost:
$2,080
- - $536 155 - - -
-
kWh
$536
155
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$519
Cost:
-
$519 10,551 - - - - $519
10,551
kWh
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$41
Cost:
-
$341 16,120 - - $(-300) - $341
16,120
kWh
-
-
MMBtu
$(-300)
-
$
TOTAL RECOMMENDED Savings:
$41,189
Cost:
$22,280
$50,096 725,675 $(-8,607) (-2,488) $(-300) - $50,096
725,675
kWh
$(-8,607)
(-2,488)
MMBtu
$(-300)
-
$
TOTAL IMPLEMENTED Savings:
$1,730
Cost:
$1,500
$860 26,671 $1,170 338 $(-300) - $860
26,671
kWh
$1,170
338
MMBtu
$(-300)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes