IAC logo
IAC Assessment: OK0330
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0330
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1990
Principal Product CUSTOM THERMOFORMING
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 10,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $481,562 11,885,112 kWh $0.04
Natural Gas $1,440 484 MMBtu $2.98
TOTAL ENERGY COSTS $483,002
RECOMMENDED SAVINGS* $25,975 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,714
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,537
Cost:
$16,218
$5,537 234,467 - - $5,537
234,467
kWh
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$156
Cost:
-
$306 12,896 $(-150) - $306
12,896
kWh
$(-150)
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,218
Cost:
$2,838
$3,218 136,284 - - $3,218
136,284
kWh
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,329
Cost:
$450
$1,329 56,272 - - $1,329
56,272
kWh
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$724
Cost:
$564
$724 30,774 - - $724
30,774
kWh
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$524
Cost:
$221
$524 22,274 - - $524
22,274
kWh
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,368
Cost:
$700
$7,368 312,134 - - $7,368
312,134
kWh
-
-
$
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,119
Cost:
-
$7,119 223,916 - - $7,119
223,916
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$25,975
Cost:
$20,991
$26,125 1,029,017 $(-150) - $26,125
1,029,017
kWh
$(-150)
-
$
TOTAL IMPLEMENTED Savings:
$19,714
Cost:
$4,209
$19,864 763,776 $(-150) - $19,864
763,776
kWh
$(-150)
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes