IAC logo
IAC Assessment: OK0346
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0346
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1991
Principal Product DENIM JEANS
NAICS n/a
SIC 2326 - Men's and Boys' Work Clothing
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 4,200,000 Pieces
Production Hrs. Annual 2,025
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $78,454 1,350,234 kWh $0.06
Natural Gas $4,357 906 MMBtu $4.81
TOTAL ENERGY COSTS $82,811
RECOMMENDED SAVINGS* $7,434 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,434
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$857
Cost:
-
$857 14,361 - - - - $857
14,361
kWh
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,919
Cost:
-
$3,949 66,530 - - $(-1,030) - $3,949
66,530
kWh
-
-
MMBtu
$(-1,030)
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,122
Cost:
$866
- - $1,122 233 - - -
-
kWh
$1,122
233
MMBtu
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,923
Cost:
$1,500
- - $1,923 399 - - -
-
kWh
$1,923
399
MMBtu
-
-
$
05: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$613
Cost:
-
$541 9,086 - - $72 - $541
9,086
kWh
-
-
MMBtu
$72
-
$
TOTAL RECOMMENDED Savings:
$7,434
Cost:
$2,366
$5,347 89,977 $3,045 632 $(-958) - $5,347
89,977
kWh
$3,045
632
MMBtu
$(-958)
-
$
TOTAL IMPLEMENTED Savings:
$7,434
Cost:
$2,366
$5,347 89,977 $3,045 632 $(-958) - $5,347
89,977
kWh
$3,045
632
MMBtu
$(-958)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes